    replied
    Up to row 11. Almost there.

    Click image for larger version

Name:	20170617_091035.jpg
Views:	1188
Size:	96.9 KB
ID:	398836
    Click image for larger version

Name:	20170617_130258.jpg
Views:	1173
Size:	95.8 KB
ID:	398837

    Leave a comment:


  • agrasyuk
    replied
    Installed missing bricks in row 6 and completed row 7. Things getting more and more vertical.

    Click image for larger version

Name:	20170611_091403.jpg
Views:	1157
Size:	94.4 KB
ID:	398631

    Leave a comment:


  • agrasyuk
    replied
    Got over the arch . Not the best, but very usable. For row 6 each brick is cut into 3 pieces with bevel of 3.5 degrees. Bricks that sit above the opening created somewhat of a hump, will be grinding this down a bit.

    Click image for larger version

Name:	20170608_182428.jpg
Views:	1171
Size:	115.9 KB
ID:	398561Click image for larger version

Name:	20170608_182335.jpg
Views:	1162
Size:	104.1 KB
ID:	398560

    Leave a comment:


  • agrasyuk
    replied
    4 rows complete. Playing with the arch Click image for larger version

Name:	20170604_170543.jpg
Views:	1188
Size:	101.4 KB
ID:	398442

    Leave a comment:


  • agrasyuk
    started a topic Grassy 36 at BG - build log

    Grassy 36 at BG - build log

    After quite a bit of prep work I finally stepped into construction of the oven itself. Steps of Foundation and oven base can be found here :
    https://community.fornobravo.com/for...-really-enough

    vermiculate-concrete Hearth sits on top of 4" structural slab. It is 5" thick to match the height of front face bricks and oven floor. 2" of rockwool rigid insulation sheet is embeded under the brick floor.
    Gave the hearth few days to harden and laid the floor bricks . 1:1 mixture of sand and fireclay is heaven to work with.

    my biggest effort of these 3days however was the Argentinian grill section that I'm building as part of the project. Started lining the walls firebrick (my brickwork improved substantially) and my pride and joy - entry Arch .