33 Bags of cement mix today to do my slab. Pictures will be posted later. This was mu brother's and my first time working with cement. I think all things considered it came out pretty darn well. We will see after it sets up for a few days though.
Announcement
Collapse
No announcement yet.
Jake's In Mass (Started July 3, 2011)
Collapse
X
-
Re: Jake's In Mass (Started July 3, 2011)
Neil, thanks, I should clarify. The patio is going to just be pavers, no concrete. The reason it is framed out is that I currently have landscapers working around the area and I wanted them to know what to work around. No reason to sod an area that is going to get ripped up anyway.
You are completely right though, that will be my work area and when the oven is done, I'll finish that part off.
I also used pressure treated for the form, I plan on just leaving i there when I am done and let it rot out over the many coming years.
Leave a comment:
-
Re: Jake's In Mass (Started July 3, 2011)
One suggestion.
If I was doing it I would do the two pours separately. I would even complete the build of the oven and leave the patio till later. Just put the gravel layer down and pull the form work for now. This will allow you the option of altering the patio once you have seen the final oven shape. It will also give you a good working area for mortar mixing, insulation mixing, cutting, etc without having to worry about marking or damaging your patio finish.Last edited by Neil2; 07-05-2011, 10:40 AM.
Leave a comment:
-
Re: Jake's In Mass (Started July 3, 2011)
Here they are smaller
Image 310 Small
Image 311 Small
Image 312 Small
Image 314 Small
Image 315 Small
Image 316 Small
Image 317 Small
Image 318 Small
Image 319 Small
Image 320 Small
Image 321 Small
Image 322 Small
Image 323 Small
Leave a comment:
-
Re: Jake's In Mass (Started July 3, 2011)
No problem downsizing the pictures, I'll do that a little later. I tend to rely on the browser downsizing to a viewable size. I'm going to keep the full size ones around too, I always look at the pictures and want to see some small detail that I cannot make out in a small picture.
I'll also post my SketchUp of my design as I go along. Modeling the oven in 3d definitely helps you work out silly detail that could be a major problem if discovered during the build.
Leave a comment:
-
Great start!
Literally built on a rock
I laud your including the start date in your subject line -pure genius
If you upload your pictures, the software will reduce the size of your pictures. If not, you can google a free re-sizer easy enough and then include the actual picture in your posts.
Another way to do it is to go to your user control panel and start your own album there. You will have to downsizey our pictures there too.
Looks good so far.
Leave a comment:
-
Re: Jake's In Mass (Started July 3, 2011)
That pic is huge, dimension-ally. Make it smaller.
Leave a comment:
-
Re: Jake's In Mass (Started July 3, 2011)
Ahh, the images are too big, well here they are full size. Just a random set of day one pictures. I am going to try to take many pictures during this process.
Image 310
Image 311
Image 312
Image 314
Image 315
Image 316
Image 317
Image 318
Image 319
Image 320
Image 321
Image 322
Image 323
Leave a comment:
-
Jake's In Mass (Started July 3, 2011)
So, here I go. I started excavation this weekend and am ready for cement pour next weekend. I am doing a 42" oven on a 6'x 6'8" base. I have designed everything ahead of time in SketchUp, but we will see how long that model holds true.
I am also putting in a 10'x12' patio to go along with the oven.
Seems I can only post one picture per message right now, I'll try to follow up with more pictures.Tags: None