Announcement

Collapse
No announcement yet.

My 42" Pompeii Oven build, Northeast Ohio

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • #16
    Re: My 42" Pompeii Oven build, Northeast Ohio

    013a - Pallet of firebricks & 1/4" MDF oven floor template.


    4/29/12
    Last edited by boylanta; 02-04-2013, 11:14 AM.
    Todd

    Link to my build - http://www.fornobravo.com/forum/f21/...ast-18900.html

    Comment


    • #17
      Re: My 42" Pompeii Oven build, Northeast Ohio

      016 - Floor brick layout.

      Todd

      Link to my build - http://www.fornobravo.com/forum/f21/...ast-18900.html

      Comment


      • #18
        Re: My 42" Pompeii Oven build, Northeast Ohio

        016a - Oven floor layout.
        At this point I took an 45 degree grinding attachment for the Dremel & put a slight chamfer at the edge of every brick.
        This was a good tip I found from others in the forum, which keeps the pizza peel from catching.
        I have no issues w/ peels catching.
        It was much easier to do now, as opposed to when the floor is installed.


        4/29/12
        Last edited by boylanta; 02-04-2013, 02:24 PM.
        Todd

        Link to my build - http://www.fornobravo.com/forum/f21/...ast-18900.html

        Comment


        • #19
          Re: My 42" Pompeii Oven build, Northeast Ohio

          018 - FB Board Template.
          I used the B12T50A ceramic fiber board from skylinecomponents.com.

          I spent a lot of time researching and found the refractory properties an excellent match to the FB Board.
          I advocate supporting Forno Bravo as much as possible, but living on the east coast, shipping from FB was very pricey.

          Last edited by boylanta; 10-11-2013, 08:10 AM.
          Todd

          Link to my build - http://www.fornobravo.com/forum/f21/...ast-18900.html

          Comment


          • #20
            Re: My 42" Pompeii Oven build, Northeast Ohio

            018a - Cutting ceramic fiber board to size.
            Tablesaw or sawzall cut through the ceramic fiber board like butter.
            Be sure to wear a respirator!

            I used the B12T50A ceramic fiber board from skylinecomponents.com.

            I spent a lot of time researching and found the refractory properties an excellent match to the FB Board.
            I advocate support Forno Bravo as much as possible, but living on the east coast, shipping from FB was very pricey.


            5/4/12
            Last edited by boylanta; 02-04-2013, 11:15 AM.
            Todd

            Link to my build - http://www.fornobravo.com/forum/f21/...ast-18900.html

            Comment


            • #21
              Re: My 42" Pompeii Oven build, Northeast Ohio

              019 - Ceramic fiber board & floor layout being transferred to hearth.


              5/4/12
              Last edited by boylanta; 02-04-2013, 11:15 AM.
              Todd

              Link to my build - http://www.fornobravo.com/forum/f21/...ast-18900.html

              Comment


              • #22
                Re: My 42" Pompeii Oven build, Northeast Ohio

                020 - Leveling sand on ceramic fiber board.
                Ready for dome floor.
                I opted for the dry sand/fireclay 1:1 mixture as a leveling agent.
                I decided on this method in an effort to keep the ceramic fiber board from absorbing any moisture.


                5/4/12
                Last edited by boylanta; 05-09-2013, 05:53 PM.
                Todd

                Link to my build - http://www.fornobravo.com/forum/f21/...ast-18900.html

                Comment


                • #23
                  Re: My 42" Pompeii Oven build, Northeast Ohio

                  021 - Oven floor & first chain (half soldier) dry fit.
                  I used overlapping foil around the floor to keep any moisture from the mortar from contacting the FB board.
                  It worked pretty well, but it took a lot of effort to keep the FB board dry (it's not supposed to get wet).
                  If I did it over again, I probably would use the insulating concrete method.
                  On the other hand, people that use the insulated concrete hearth don't seem to like that the consistency it difficult to determine and they don't seem to know if they mixed it correctly or not.
                  So it's probably a pain in the butt either way you go.
                  My only experience is w/ the FB board though.
                  I couldn't modify the plans & switch to an insulated concrete layer at this point since the FB board is 2.5" thick & the insulating concrete is 4+" thick, so my floor height would have been off (I would recommend measuring your elbow height within ~1-2" & designing down from there if it's not too late, this will give you the most comfortable height when using the oven tools for cooking).

                  Don't make the same mistake I did by using permanent marker on the firebrick.
                  After a good amount of usage, the permanent marker burns off, so probably a moot point either way.


                  5/6/12
                  Last edited by boylanta; 05-12-2013, 06:46 AM.
                  Todd

                  Link to my build - http://www.fornobravo.com/forum/f21/...ast-18900.html

                  Comment


                  • #24
                    Re: My 42" Pompeii Oven build, Northeast Ohio

                    022 - Oven floor & first chain (half soldier) dry fit.
                    I designed the vent landing with a flared opening.
                    This was much more work for arch angles down the road, but well worth it in my opinion for the larger opening for better oven access.


                    5/6/12
                    Last edited by boylanta; 02-04-2013, 11:16 AM.
                    Todd

                    Link to my build - http://www.fornobravo.com/forum/f21/...ast-18900.html

                    Comment


                    • #25
                      Re: My 42" Pompeii Oven build, Northeast Ohio

                      023 - Oven floor & first chain (half soldier) dry fit.


                      5/6/12
                      Last edited by boylanta; 02-04-2013, 11:16 AM.
                      Todd

                      Link to my build - http://www.fornobravo.com/forum/f21/...ast-18900.html

                      Comment


                      • #26
                        Re: My 42" Pompeii Oven build, Northeast Ohio

                        024 - Mortaring first chain (half soldier).
                        You can see the overlapping tin foil around the floor to keep any moisture from the mortar from contacting the FB board.


                        5/10/12
                        Last edited by boylanta; 02-04-2013, 11:16 AM.
                        Todd

                        Link to my build - http://www.fornobravo.com/forum/f21/...ast-18900.html

                        Comment


                        • #27
                          Re: My 42" Pompeii Oven build, Northeast Ohio

                          026 - Oven floor installed, first chain mortared.
                          No turning back now.


                          5/10/12
                          Last edited by boylanta; 02-04-2013, 11:16 AM.
                          Todd

                          Link to my build - http://www.fornobravo.com/forum/f21/...ast-18900.html

                          Comment


                          • #28
                            Re: My 42" Pompeii Oven build, Northeast Ohio

                            027 - Oven floor installed, first chain mortared.
                            No turning back now.


                            5/10/12
                            Last edited by boylanta; 02-04-2013, 11:16 AM.
                            Todd

                            Link to my build - http://www.fornobravo.com/forum/f21/...ast-18900.html

                            Comment


                            • #29
                              Re: My 42" Pompeii Oven build, Northeast Ohio

                              028 - Inner arch base & inner arch form/template.


                              5/11/12
                              Last edited by boylanta; 02-04-2013, 11:16 AM.
                              Todd

                              Link to my build - http://www.fornobravo.com/forum/f21/...ast-18900.html

                              Comment


                              • #30
                                Re: My 42" Pompeii Oven build, Northeast Ohio

                                029 - Inner arch base & inner arch form/template.


                                5/11/12
                                Last edited by boylanta; 02-04-2013, 11:17 AM.
                                Todd

                                Link to my build - http://www.fornobravo.com/forum/f21/...ast-18900.html

                                Comment

                                Working...
                                X