Thanks for the reply tfasz. Yes I poured the structural concrete on Saturday followed by the insulating layer Sunday. I have been keeping a tarp over it to keep the sun off of it and it has set up nicely.
I have layed a few blocks and brick in the past but I'm taking my time and trying to do a nice job. It's not perfect but pictures hide alot.
Announcement
Collapse
No announcement yet.
42" Pompeii in Kentucky
Collapse
X
-
Re: 42" Pompeii in Kentucky
Looking nice. Could not be 100% sure from the pics, but you have a concrete slab with rebar in it that you poured on Saturday and then you put the perlcrete over it on Sunday right? It will take some time to setup, and keeping it damp during the week will help it setup.
Nice work on the foundation - you look like you must have some prior masonry experience to get it that nice on your first shot.
Leave a comment:
-
Re: 42" Pompeii in Kentucky
I pulled the forms off today. The insulating concrete has dried nicely and is very firm. I hope to start constructing the dome and floor this weekend and maybe post some more pictures. I realized yesterday that I forgot to leave a hole in the slab for my floor thermocouple so I stopped today after work and bought a 12" long 1/4" masonry bit. I hope I don't hit rebar!!!
Leave a comment:
-
Re: 42" Pompeii in Kentucky
Dave, I'm glad you mentioned that the perlcrete stays spongy for a week because I was just going to ask. I poured the perlite mix early this morning and after about 15hrs it feels like a rice krispy treat, probably doesn't taste like one though. I thought I would post a few more pics.2 PhotosLast edited by ckdickerson; 05-13-2010, 07:08 PM.
Leave a comment:
-
Re: 42" Pompeii in Kentucky
If the perlite can hold 300 psi, then considering an 8 sq inch footprint of a soldier, you are talking a compression capability of 2400lbs per brick. With maybe 40 soldiers, the perlite would support a 100,000 pound oven (In theory). I was worried about the perlite mix also, especially because it stays spongy for about a week, but it works great.Originally posted by ckdickerson View PostAfter the last post I did a little research and if I understand it correctly a 5:1 mix of perlite and portland is in the neighborhood of 300psi. I'm sure thats sufficient but somehow it just doesn't seem right. But then again I have never used this stuff. I need to just trust the plans and all of those of you that have been through this.
Dave
Leave a comment:
-
Re: 42" Pompeii in Kentucky
Poured some concrete today. Hard work. Thought I would post some pics.4 Photos
Leave a comment:
-
Re: 42" Pompeii in Kentucky
Thanks for the reply Drake. Yes I did download the plans. I was just a little concerned about the compresive strength of the perlite concrete. After the last post I did a little research and if I understand it correctly a 5:1 mix of perlite and portland is in the neighborhood of 300psi. I'm sure thats sufficient but somehow it just doesn't seem right. But then again I have never used this stuff. I need to just trust the plans and all of those of you that have been through this.
Leave a comment:
-
Re: 42" Pompeii in Kentucky
You should build the whole oven, dome and floor, on top of the perlcrete. It has good compressive strength. Did you download the free plans from the forno bravo store? Insulation under the dome may be the most important step...Of course all of the perlcrete must sit on top of the structural slab.Originally posted by ckdickerson View PostI was just wandering if I should stop the perlite at the edge of the floor and build the dome on structural concrete or if it's ok to build the dome on the insulating concrete.
Great looking work so far!
DrakeLast edited by DrakeRemoray; 05-07-2010, 10:40 PM.
Leave a comment:
-
Re: 42" Pompeii in Kentucky
I just finished laying the brick. As I was finishing it started raining and splashed some mortar on the brick on the left side. I hope a pressure washer will take it off after it dries. Tomorrow I will start building forms. Can someone tell me if the perlite concrete will support the weight of the oven? I have cut my oven floor bricks to fit inside the dome walls and the dome will be built directly on the slab. I was just wandering if I should stop the perlite at the edge of the floor and build the dome on structural concrete or if it's ok to build the dome on the insulating concrete.2 Photos
Leave a comment:
-
Re: 42" Pompeii in Kentucky
Thanks for the help. Who knows, when I start building forms I may decide to extend the slab further. I just thought it would look better to not have the concrete slab all the way out to the edge of the coping.
Leave a comment:
-
Re: 42" Pompeii in Kentucky
It should work, 6" overhang MAY work, but that is a high abuse area.
Leave a comment:
-
Re: 42" Pompeii in Kentucky
Thanks for the reply TScarborough, I can't push the coping in 2" but I suppose I could let the slab stick out 8" instead of 6" which would put 8" of the coping on the concrete and 4" hanging over. Do you think this will work? I'm open to suggestions.
Leave a comment:
-
Re: 42" Pompeii in Kentucky
3" is fine on the concrete thickness, but if I am reading your post correctly, you plan on cantilevering a 12" piece of pool coping 6" from the face of the brick? That does not sound like a good plan. Can you push it in and get 8" on the hearth?
Leave a comment:
-
Re: 42" Pompeii in Kentucky
I was going to pour the hearth ledge and allow it to overhang the brick by about 6" and then lay the 12" pool coping which would overhang the ledge another 6"for a total of 12" on the hearth. In order for the brick to work out right the ledge would be 3" thick. I don't know much about concrete. Should the 3" thickness on the ledge be sufficient and would the 6" of bond area be enough to bond the pool coping without any problem?
Leave a comment:
-
Re: 42" Pompeii in Kentucky
I started laying the brick this week. I worked on it a few hours after work each day this week. Mix one batch of mortar, lay four runs of brick, clean up the tools, strike the joints, and then repeat process the next day. It took three days to get this far but at least I'm almost finished with the brick for now. I should finish the brick tomorrow and then I'll start building the forms for the slab. It's hard to believe this all started from a simple question like.....Honey, what are we going to do with the left over brick from the house? I know........1 Photo
Leave a comment: