Today I finally got ready for pouring the footings - which I'll leave until next year (next week)...
Attached a shot of the round footing arrangement, with twin pieces of steel mesh in position at the top and bottom position. I plan to have a slab thickness of 125 mm. (Engineers: pls yell if there's something seriously amiss that I can correct before the pour!)
Have a brilliant New Year!
Carioca
Attached a shot of the round footing arrangement, with twin pieces of steel mesh in position at the top and bottom position. I plan to have a slab thickness of 125 mm. (Engineers: pls yell if there's something seriously amiss that I can correct before the pour!)
Have a brilliant New Year!
Carioca
Comment