It would have been cheaper and a little easier to buy pre mixed BUT I chose the bags. Why? - It allowed me the freedom to do it when I wanted to and since I hadn't worked in concrete I never wanted to order too much OR too little. I think the most I did was 35 bags to fill the cores... 2-3 people using 2 wheelbarrows to get the job done. You can do about 90% of the build yourself - but there are times when you'll need a hand.
Good Luck.
Dick
JAG,
It would have been cheaper and a little easier to buy pre mixed BUT I chose the bags. Why? - It allowed me the freedom to do it when I wanted to and since I hadn't worked in concrete I never wanted to order too much OR too little. I think the most I did was 35 bags to fill the cores... 2-3 people using 2 wheelbarrows to get the job done. You can do about 90% of the build yourself - but there are times when you'll need a hand.
Good Luck.
Dick