It will be (at least I hope) 43" or 45" Tuscan style, corner installation, as a part of outdoor kitchen.
Foundation is made like a floating one (freeze line here is about 150 cm, 60") laying on the hard clay. Foundation size is 190x190 (75"x75"), stand will be 160x160 (63x63), will make it of haydite concrete blocks.
The main problem on the stage of preparation (despite the English building terms and language barrier) is complete difference in trademarks of available materials here, in Russia, so I have to check everything 5 times before making a decision, but this forum and whole FB site helps a lot.
This weekend was spent completely on making rebar and pouring the foundation concrete. Last week was quite rainy so heap of sand dumped, so I spent a huge amount of time and muscle power on screening it out - I was forced to push each shovel of sand through the mesh sieve. Was so tired yesterday so even didn't made a photo of poured foundation.
Foundation is made like a floating one (freeze line here is about 150 cm, 60") laying on the hard clay. Foundation size is 190x190 (75"x75"), stand will be 160x160 (63x63), will make it of haydite concrete blocks.
The main problem on the stage of preparation (despite the English building terms and language barrier) is complete difference in trademarks of available materials here, in Russia, so I have to check everything 5 times before making a decision, but this forum and whole FB site helps a lot.
This weekend was spent completely on making rebar and pouring the foundation concrete. Last week was quite rainy so heap of sand dumped, so I spent a huge amount of time and muscle power on screening it out - I was forced to push each shovel of sand through the mesh sieve. Was so tired yesterday so even didn't made a photo of poured foundation.