Re: my new oven in progress summer 08
Thanks for the info, did you use a lot of re-bar?
Thanks for the info, did you use a lot of re-bar?

n only and not the entrance and it is countersunk in the concrete slab the sidewall of the verm. insul. is touching the concrete, basically I built a slab with a circle of 50'' of vermiculite in the center of it at the same level did not leave a space between side walls of vermiculite and concrete,and placed the floor on top of that therefore the floor bricks are touching the concrete slab, during the summer I noticed the concrete slab was very warm during a 4-5 hour pizza party cooking of 25-30 pizzas is that normal or am I trying to create more work for myself by insulating the floor. thanks for your thoughts. Phil.