Hi, I build my first real brick oven this past summer 2025. Using the Pompeii Oven Plans.
My issue is that after the dome was make i waited about a week then started my five fires. my last fire i saw in some places that smoke was coming through between the Heat Stop 50 Refractory Mortar and the bricks. So i put a layer of Heat Stop 50 Refractory Mortar over the dome hoping that would solve the issue. Well the layer of Heat Stop 50 mortar is coming off the dome.
My Questions are.
1) why is the mortor coming off?
2) can i put the installation over the dome even though the smoke is coming through the cracks?
3) is Heat Stop 50 Refractory Mortar - Dry Mix: Fire-resistant mortar ok to use over the dome, then put the installation, chicken wire, normal mortar?
4) If i use a liquid form of Heat Stop 50 to fill the crack will that help?
thanks
eric
My issue is that after the dome was make i waited about a week then started my five fires. my last fire i saw in some places that smoke was coming through between the Heat Stop 50 Refractory Mortar and the bricks. So i put a layer of Heat Stop 50 Refractory Mortar over the dome hoping that would solve the issue. Well the layer of Heat Stop 50 mortar is coming off the dome.
My Questions are.
1) why is the mortor coming off?
2) can i put the installation over the dome even though the smoke is coming through the cracks?
3) is Heat Stop 50 Refractory Mortar - Dry Mix: Fire-resistant mortar ok to use over the dome, then put the installation, chicken wire, normal mortar?
4) If i use a liquid form of Heat Stop 50 to fill the crack will that help?
thanks