Announcement

Collapse
No announcement yet.

daves build

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • crwdtb
    replied
    Re: daves build

    I was wondering regarding the refractory mortar how long it takes to dry? or does it always remain slightly pliable? seems to have properties like a hard putty!
    cheers
    dave

    Leave a comment:


  • crwdtb
    replied
    Re: daves build

    update, got another course of bricks done. and started on dome

    Leave a comment:


  • crwdtb
    replied
    Re: daves build

    Ok I just saw it myself yes that corner brick is upside down! getting a bit weary by the end of the day, 3 kids , wife just had knee reconstruction!
    cheers
    dave

    Leave a comment:


  • crwdtb
    replied
    Re: daves build

    thanks guys for your help I seem to be struggling through it, this is the first time I have ever laid any bricks! managed to get a few courses done today, even getting into the lingo! its not perfect but I am moving forward, which is the main thing.

    Leave a comment:


  • crwdtb
    replied
    Re: daves build

    thx tscar
    I will certainly do that, all good info, thankyou.

    Leave a comment:


  • Tscarborough
    replied
    Re: daves build

    Use a plumbob or level to bring down each upper corner to the foundation. mark that point as the inner face of your brick veneer. If the stand is out of plumb, this will ensure that the veneer will meet the top of the base and can be built plumb while doing so.

    To lay it, use your level vertically, horizontally and across the face to build the corners out, then use a string between the corners to lay the filler brick.

    Leave a comment:


  • crwdtb
    replied
    Re: daves build

    sry nissan I meant I am going to put normal reds around the stand before starting on the dome. I was just going to let the 2nd slab really set before loading it up as I would be fairly put out if it cracked(not that it would) because I was impatient.
    cheers

    Leave a comment:


  • crwdtb
    replied
    Re: daves build

    thx dmun ,
    I thought that I could use the stand wall as a guide, its not perfectly str8 but it will do the job I think. I appreciate the feedback.
    Cheers
    Dave

    Leave a comment:


  • dmun
    replied
    Re: daves build

    I have just poured 2nd slab and while I am waiting for that to cure I was going to brick up the stand.Having never done this before, should I use a string line? or just go off the blocks?
    You want to lay up face bricks on the exterior of the stand? There's no reason why you can't just use the stand as your guide. It looks like your stand protrudes enough for the brick facing to have a good footing.

    If you haven't laid brick before, you may want to look into the bricky tool. I used it, and I recommend it. It makes bad bricklayers good, and good ones fast.

    Leave a comment:


  • nissanneill
    replied
    Re: daves build

    Dave,
    now you've got me confused!

    while I am waiting for that to cure I was going to brick up the stand
    From the picture provided, it looks like you have already done the stand, now you need to put in your insulation layer(s) and then either your heart (if you are going to sit your dome on that) or your soldier course and then put your hearth in it before you close your dome.
    What stand were you referring to?

    Cheers.

    Neill

    Leave a comment:


  • crwdtb
    started a topic daves build

    daves build

    Gday all,
    I have just poured 2nd slab and while I am waiting for that to cure I was going to brick up the stand.Having never done this before, should I use a string line? or just go off the blocks? any tips or suggestions would be most welcome
Working...
X