Re: Oven Build in SC
Back at it again! Finished the last course and I'm starting to fashion the top key stone. Took baby steps all summer long between work, rain, vacation, work.
Anyway very excited to be at this point. After the keystone, onto the entry arch and chimney.
I have a question about the chimney for anybody- I have enough fire brick left over that I can fashion part or all the chimney from the firebrick. If I do that is that to much weight on the entry arch? I was thinking either all brick which could add up to a couple hundred pounds or build up a foot or so then go with the double wall pipe for two feet. I wasn't sure if it would need an abuntment. If so how do I do an abuntment?? This would sit on the entryway which will be the rounded archway type the same as the oven opening.
Anyway, here is the progress so far.
Back at it again! Finished the last course and I'm starting to fashion the top key stone. Took baby steps all summer long between work, rain, vacation, work.
Anyway very excited to be at this point. After the keystone, onto the entry arch and chimney.
I have a question about the chimney for anybody- I have enough fire brick left over that I can fashion part or all the chimney from the firebrick. If I do that is that to much weight on the entry arch? I was thinking either all brick which could add up to a couple hundred pounds or build up a foot or so then go with the double wall pipe for two feet. I wasn't sure if it would need an abuntment. If so how do I do an abuntment?? This would sit on the entryway which will be the rounded archway type the same as the oven opening.
Anyway, here is the progress so far.
Comment