Been lurking for years on the forum and have finally started my build with the stand completed. I started using the spread sheet and IT (thank you for those valuable tools) for my trial run with brick cuts. My dome will be a 36".
Should the soldier course be mortared to the floor or should it "float." To my way of thinking there is an expansion factor of floor verses dome that may lead to cracking at that joint. My soldier course will be directly on top of the floor ( soldiers will be lying flat and not standing - 2 1/2" vs 4 1/2" as the spread sheet suggests).
Being new to all of this, any suggestions or corrections will be appreciated.....Jinxy
Should the soldier course be mortared to the floor or should it "float." To my way of thinking there is an expansion factor of floor verses dome that may lead to cracking at that joint. My soldier course will be directly on top of the floor ( soldiers will be lying flat and not standing - 2 1/2" vs 4 1/2" as the spread sheet suggests).
Being new to all of this, any suggestions or corrections will be appreciated.....Jinxy
Comment