Hi all,
I just poured my insulating layer and have the grid of rebar in it as instructed. I noticed that the grid doesn't sit exactly in the center of the concrete slab. It's about 2/3 of the way up from the bottom of the slab, where it should be half way up. Should I be concerned about the integrity of the concrete and how the rebar will be holding it?
Thanks so much,
David
I just poured my insulating layer and have the grid of rebar in it as instructed. I noticed that the grid doesn't sit exactly in the center of the concrete slab. It's about 2/3 of the way up from the bottom of the slab, where it should be half way up. Should I be concerned about the integrity of the concrete and how the rebar will be holding it?
Thanks so much,
David
Comment