Finishing up my 36" build and had 3 curing fires with the insulation on. Got up to 300 degrees. Had a nice day yesterday and slapped on the scratch coat. Then last night it dawned me i prolly should have finished the curing process before rendering. I confirmed that on this priceless forum. Apparently one cant research enough. So now do i finish the curing process, finish the rendering, or both? 4" of ceramic blanket so it shouldnt cook the render too much. Thoughts?
X
-
The "cure before render" is a recommendation not a rule. Just go slow on the curing fires. Lay a piece of clear plastic loosely over your vent occasionally to check for escaping moisture. It's amazing how much moisture is contained in a new build, especially when an insulating concrete (perlcrete or vermicrete) is incorporated...or a lot of mortar has been used to fill in dome brick gaps. Go extra slow and do some baked small potatoes in a Dutch oven or beans or a batch of ribs with long, slow & low temp cooking. Those 300-400F temps are perfect for a lot of good eats.Mike Stansbury - The Traveling Loafer
Roseburg, Oregon
FB Forum: The Dragonfly Den build thread
Available only if you're logged in = FB Photo Albums-Select media tab on profile
Blog: http://thetravelingloafer.blogspot.com/
- 1 like
Comment
-
Heed Mike's advice, this is where we see builders get too excited and fire too fast and hot and potentially damage the oven or outer coatings.Russell
Google Photo Album [https://photos.google.com/share/AF1Q...JneXVXc3hVNHd3/]
Comment
Comment