Chronologically, this is a continuation of my oven building thread, but I decided to continue here briefly to stay topical.
After the dome construction, I ripped out the form and dried the inside for three days using a ceramic space heater. I put a thermometer and hygrometer in there to monitor the temp and humidity. It got fairly warm, but at the end of three days, the floor bricks in the doorway were still damp. Turns out, they stayed damp through three firings.
After the dome construction, I ripped out the form and dried the inside for three days using a ceramic space heater. I put a thermometer and hygrometer in there to monitor the temp and humidity. It got fairly warm, but at the end of three days, the floor bricks in the doorway were still damp. Turns out, they stayed damp through three firings.
Comment