Hello, I'm being tripped up by the wording in the install guide again.
I'm on part 5 of the residential install, and I've come across this short passage:
"Seal the intersection between the oven dome and vent and the insulating board with a 2?w x 3/4?h band of high heat mortar."
Could someone break this up for me? I need a 2 inch wide by 3/4 high band of mortar on the ? what exactly? This is for a Casa2G90- is this for the very front (assuming we're not talking about the chimney here), where it's flush with the insulating board? Or does this maybe not apply to my Casa2G90?
thanks!
I'm on part 5 of the residential install, and I've come across this short passage:
"Seal the intersection between the oven dome and vent and the insulating board with a 2?w x 3/4?h band of high heat mortar."
Could someone break this up for me? I need a 2 inch wide by 3/4 high band of mortar on the ? what exactly? This is for a Casa2G90- is this for the very front (assuming we're not talking about the chimney here), where it's flush with the insulating board? Or does this maybe not apply to my Casa2G90?
thanks!