Re: Out of work Pizza Man's 42" Build in NJ
Yes, I am getting some overlay of the bricks. A little thing that I would certainly correct if I ever build a second oven. As long as the oven works and does not fall apart, I will be happy. I fully expect cracks to form. Even the best builders on this forum have them, so I am not too concerned with that. As long as I can make the oven aesthetically pleasing by enclosing the dome and putting on a veneer finish, my wife will be happy and won't tell me to tear it down!
Announcement
Collapse
No announcement yet.
Out of work Pizza Man's 42" Build in NJ
Collapse
X
-
Re: Out of work Pizza Man's 42" Build in NJ
Looks like really great progress. I'd suggest getting some cardboard or something over your oven floor to keep it clean and avoid chips. Also, echoing Greenman's comment it still looks like your IT axis is maybe not hitting the bricks in the middle of each course. You're getting a bit of stagger
Leave a comment:
-
Re: Out of work Pizza Man's 42" Build in NJ
It is a little difficult to tell from your pics but it appears that the angle that your IT is setting your bricks is a little less than what is needed to avoid the bottom of the brick protruding from the course below it.
Other than that it seems to be coming together fine. The exposed mortar on your soldier course will probably spall off to an extent over time. It is difficult to clean it up after it has set properly.
Leave a comment:
-
Re: Out of work Pizza Man's 42" Build in NJ
Here are more progress pics.5 Photos
Leave a comment:
-
Re: Out of work Pizza Man's 42" Build in NJ
I have been working hard to get this oven dome done. I have almost completed 6 courses and the soldier course, for a total of 7. Things appear to be going well. I installed the opening archway. I cut the archway bricks using Amac's "3 cut" advice (I actually measured the lines of the cut on my computer monitor and converted for my brick size to figure out exactly how to cut). Thank you to everyone who has contributed. I used design ideas from many other builds. Overall, the build is a little sloppy. Wish I would have scraped off the mortar from the inside of the soldier course. I let it dry and it is extremely difficult to remove now unless I use my angle grinder. What will that mortar do once the oven gets fired up?
Take a look at my pics.6 Photos
Leave a comment:
-
Re: Out of work Pizza Man's 42" Build in NJ
How does this look for using as a Thermal Break Rope? Also comes with Cement to adhere the rope to your oven.
http://www.amazon.com/MeecoS-203BK-2...ds=gasket+ropeLast edited by spiderrinaldi; 10-10-2014, 06:21 PM.
Leave a comment:
-
Re: Out of work Pizza Man's 42" Build in NJ
My opening arch and thermal breaks are a cross between several builds. I chose a semi circle arch because I thought it simplified things and requires little or no buttressing. I have to give credit to deejayoh, utahbeehiver and Gulf's build's. I'm pictorial in understanding a concept and their well document pictures and album made my build a success. Below is post Utah posted on my thread about his heat break.
Originally posted by UtahBeehiver View PostKB,
I used Uni Extreme high temp caulk. It is made by McGill Air Seal and contains no hazardous stuff although it was used in an area that does not see food contact. Like DJ I stuff the air gap with ceramic rope and caulked over. I have a floor thermal break, SS tubing, does it make a difference, I don't know since I can't compare as if brick were there.
Being new to the Forno Bravo web site, we quickly realized that we wanted to build a pizza oven and access the best information available, but did not know where to look. Getting smart about building a Wood Fired Oven (WFO) would have been easier with a little tutoring. So, listed in bold below, you find a few shortcuts to
There are a lot of good builds to study and give you ideas to work out your arch opening heat breaks and over all oven design. Also a special thanks to lburou for putting this thread together. It's key to a builders success and deserves a "sticky"
Hope this helps.Last edited by kbartman; 10-10-2014, 07:40 AM.
Leave a comment:
-
Re: Out of work Pizza Man's 42" Build in NJ
Thanks for the guidance.
My next question is in regards to the opening arch.
Thermal breaks, buttresses, flues, there is a lot to consider here. Anyone have any suggestions? I don't want to complete another course without settling on a plan.
Leave a comment:
-
Re: Out of work Pizza Man's 42" Build in NJ
I think in practice there is a bit of slop in any IT so you may get more or less stagger in your build by having it hit the wrong place. I only figured out the angles really worked when I built the spreadsheet model. But there is that difference between theory and practice.
That said, an IT that aligns the axis at the top of the brick is a pretty common design flaw and there are enough builders that have had problems with it later that I try to point it out when I see it
Sorry for the hijack.
Leave a comment:
-
Re: Out of work Pizza Man's 42" Build in NJ
Originally posted by deejayoh View PostThe IT works best if it hits in the center of the brick. If it hits on the bottom, the angle is slightly shallow. If it hits on the top, it's too steep. When the plane on the face of the brick is perpendicular to the IT at the center of the brick, each section will be an arc with the same radius.
I really appreciate your response and thank you for helping me gain a better understanding.
Spider, if I may I will try to keep this short in order not to high jack your thread. Hope you don't mind me calling you Spider.
The error of my thinking is in reference to my IT as constructed. Theoretically speaking Dee I agree. I want to point out that as viewed in my picture my brick bracket extends beyond the center of the brick. If one was to attach the IT in the center it needs to be pointed out that any bracket extending beyond the exact center would move the brick outward when lifted when lifted. So mechanically speaking my "IT" as constructed does not interfere with brick set when lifted.
With that said, theoretically the first brick above the over floor would be slightly tilted inward. If the oven floor was dead center of the sphere, and the "IT" pivoted in exact center. I believe it can be said that most builder begin the first course of bricks level to the floor. Anyway I believe I now have a much better understanding of the geometry involved.
I hope this help clarify the point I was trying to make in my observation mechanically speaking. Any bracket extending beyond the theoretical dead center of the brick, would cause the brick to move when lifted or moved horizontally opposite the portion of the bracket extending beyond the theoretical center.
Am I incorrect in my thinking?
Thanks all ,
Leave a comment:
-
Re: Out of work Pizza Man's 42" Build in NJ
Originally posted by kbartman View PostSpider,
Nice start on your oven. Looking good. Best of luck with your build.
Since the subject on the IT is back in the spot light. I would like to put my 2cents in again. I'm no math or geometry wizard but did played a lot with my "IT" during construction. As seen with the attached pics, I believe the bottom of the brick is the were IT rod needs to connect to brick bracket. I finished my dome with the rod attached to the bottom of brick bracket with full success and no offset of courses. It seems to me and also proved out as seen in the pics that a small offset would still be introduced with the bracket in the middle of brick. It maybe not perceived or as much as the top of brick, But still may exists. I posted a similar observation during the construction of my dome and no one commented. I'm still curios if my observation's are correct.
Also notice the right angle of the brick bracket in the third pic. If the rod was attached to in the middle of brick bracket any of the lower portion of the bracket below the rod would push the brick away from set as the IT is lifted.
Humbly those are my observations.
Any One care to comment that would be greatly appreciated.
Leave a comment:
-
Re: Out of work Pizza Man's 42" Build in NJ
Originally posted by spiderrinaldi View Post
I also fixed my IT.
What am I supposed to do with those left over chips? I see some people using them as some sort of spacer in their builds. Are they there to simply fill in voids, and are later cut off with an angle grinder? Can someone explain?
Leave a comment:
-
Re: Out of work Pizza Man's 42" Build in NJ
I tapered both the top and bottom of my bricks to reduce the size of the horizontal gap on the outside of the oven. I bevelled the sides of each brick on inside and outside faces to reduce the size of the gap on the outside of the oven. I think I ended up with 3/16' joint on the inside, 1/2" on the outside. The plan was to gain a uniform size joint throughout and reduce the amount of mortar I used.
This was extremely time-consuming. And while satisfying to do, if I had it to do over again I wouldn't be so detailed on the entire brick. Just the inside. Homebrew mortar is cheap.
As you gain practice, you will be able to bevel each side of your bricks by eye. You'll be surprised how accurate you can be.
Some guys collect pea-sized firebrick chips and use them as aggregate in mortar for the bigger outside gaps. I collected all my cutoff chips in a 5gal bucket and threw them away.
Leave a comment:
-
Re: Out of work Pizza Man's 42" Build in NJ
Originally posted by spiderrinaldi View PostOK, I understand what you mean. Yes, I see now where this could be a problem moving forward.
Nice start on your oven. Looking good. Best of luck with your build.
Since the subject on the IT is back in the spot light. I would like to put my 2cents in again. I'm no math or geometry wizard but did played a lot with my "IT" during construction. As seen with the attached pics, I believe the bottom of the brick is the were IT rod needs to connect to brick bracket. I finished my dome with the rod attached to the bottom of brick bracket with full success and no offset of courses. It seems to me and also proved out as seen in the pics that a small offset would still be introduced with the bracket in the middle of brick. It maybe not perceived or as much as the top of brick, But still may exists. I posted a similar observation during the construction of my dome and no one commented. I'm still curios if my observation's are correct.
Also notice the right angle of the brick bracket in the third pic. If the rod was attached to in the middle of brick bracket any of the lower portion of the bracket below the rod would push the brick away from set as the IT is lifted.
Humbly those are my observations.
Any One care to comment that would be greatly appreciated.3 Photos
Leave a comment:
-
Re: Out of work Pizza Man's 42" Build in NJ
Today I finished the next course. I will get a picture up at a later time. I did not taper this course at all, and I didn't like how wide the mortar gaps are on the outside part of the oven. I have decided to begin tapering the remaining courses. I cut a bunch for the next course and tested my cuts by dry stacking them. They line up really good. Did a 5 degree cut on both sides of the half brick to taper.
I also fixed my IT.
What am I supposed to do with those left over chips? I see some people using them as some sort of spacer in their builds. Are they there to simply fill in voids, and are later cut off with an angle grinder? Can someone explain?Last edited by spiderrinaldi; 10-09-2014, 12:39 PM.
Leave a comment:
Leave a comment: