Yep - mine is the same. I probably didn't add enough concrete mix to the vermiculite.
To set my floor I put a scratch coat of refractory mortar, then leveled it off. After it cured I put a layer of fireclay/water and set my floor bricks. I then mortared my soldiers to the scratch coat.
If you go with the FB board (CalSil) under your floor the small voids could be filled with dry fireclay