One (tiny) thought: if you do opt for a removable wooden post make sure to include a 'drainage hole' at the bottom.
Possible means: Cut a 1/2 PVC pipe maybe 6 - 12 inches long, stuff it with plastic (bags will work) and make sure one end has an inch of 'poof from the plastic. Before your pour, drill a hole in the bottom of the hole and stick in the PVC - make sure a few inches are above the 'grade'. When you set in the plastic wrapped post push down until you hit that extra resistance.
When it's dry and you've gotten the wood out, pull out the plastic bags. Won't be perfect but it should drain the hole. Water WILL seep in, wood or no, so you want good drainage into the supporting gravel bed.

Leave a comment: