I need to replace everything from the water supply valve on up on the toilet. I hadn't bothered before now because we were still trying to get the septic tank dealt with - and having the toilet shut off meant I couldn't accidentally over flow the bowl.
Well, one pumping, four weeks trying and failing to get a repair estimate, one repairman's evaluation (different contractor - if you're ever in need of septic repair in Alabama I know just the guy you need!) and a plumber later and the bowl flushes properly - on a side note, a shirt is not an adequate substitute for a seal between the pipe and the septic tank
. So now it's time to repair the rest of the toilet.
Okay, I read all the directions and I think I can do this (it's a girl thing - we are genetically programmed to read the instructions). but it has been really, really cold down here and will be pretty cold the rest of the week (it snowed! It is not supposed to snow in Alabama!!!) so I'm wondering if it would be best to wait until it's warmer. All the parts I'm working on are in the house but I'm going to be replacing the water supply valve which is just barely in the house (stupid wannabe plumber stuck the thing almost into the subfloor. Well, at least this one turns
) which worries me some.
Whatta you guys think? Wait for warmer weather or go for it?
Well, one pumping, four weeks trying and failing to get a repair estimate, one repairman's evaluation (different contractor - if you're ever in need of septic repair in Alabama I know just the guy you need!) and a plumber later and the bowl flushes properly - on a side note, a shirt is not an adequate substitute for a seal between the pipe and the septic tank
Okay, I read all the directions and I think I can do this (it's a girl thing - we are genetically programmed to read the instructions). but it has been really, really cold down here and will be pretty cold the rest of the week (it snowed! It is not supposed to snow in Alabama!!!) so I'm wondering if it would be best to wait until it's warmer. All the parts I'm working on are in the house but I'm going to be replacing the water supply valve which is just barely in the house (stupid wannabe plumber stuck the thing almost into the subfloor. Well, at least this one turns

Whatta you guys think? Wait for warmer weather or go for it?
Comment