Thanks for all the valuable information and ideas contained here, including much needed advice from all the great folks here, I finally started my WFO build a couple of weeks ago.
The 34" oven will be located in a nook just outside of the side door which leads into the kitchen. I will run a 6" stove pipe with spark arrestor well above the roof. Dome walls will be built using bricks cut down to 3" in thickness (as explained in another thread).
Also, as mentioned in detail in another thread as to the reasons why, the free-standing sonotubed stand simply sits unanchored (except for the pins) over a tiled slab.
The 34" oven will be located in a nook just outside of the side door which leads into the kitchen. I will run a 6" stove pipe with spark arrestor well above the roof. Dome walls will be built using bricks cut down to 3" in thickness (as explained in another thread).
Also, as mentioned in detail in another thread as to the reasons why, the free-standing sonotubed stand simply sits unanchored (except for the pins) over a tiled slab.
Comment