Announcement

Collapse
No announcement yet.

Oasis Rising

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • WoodchuckDad
    replied
    Re: Oasis Rising

    Thank you. I am excited to start feeling that the roof is near

    Leave a comment:


  • eprante
    replied
    Re: Oasis Rising

    WCD,
    That is a damn fine oven you have built. Problems are part of the process. The good thing is you are cooking and eating out of the oven and what you have left is the cosmetic stuff ( also the stuff that is most important to your significant other, an important person to keep happy). The rest of it is easy, but time consuming because it will show forever ( all that great brick work you did on the inside of the oven, only you and the people on this forum care about, everybody else- its about the pizza and how the oven looks from the outside).
    Nice job, I really like the red brick enclosure and stand.
    Eric

    Leave a comment:


  • WoodchuckDad
    replied
    Re: Oasis Rising

    Oh, yeah. I replaced it. It wasn't as hard as i expected to remove it, but I had to chisel out the Heatstop 50....that stuff is hard as nails.

    Leave a comment:


  • Tscarborough
    replied
    Re: Oasis Rising

    I would replace it. It is ten or twelve bucks, but it is also definitely broken.

    Leave a comment:


  • WoodchuckDad
    replied
    Re: Oasis Rising

    I mentioned the problem with the clay flue pipe.
    This is what it looked like.


    I replaced it and started cutting and laying brick again. I feel like I am about to have a break thru that will drag me across the finish line.



    A couple weeks and I should be putting a roof on it.
    Last edited by WoodchuckDad; 09-12-2010, 07:48 PM.

    Leave a comment:


  • DaveW
    replied
    Re: Oasis Rising

    But how were the ribs??

    I did the same thing. After adding mortar around the base of the clay chimney flue it cracked in a spiderweb top to bottom, but it did not split in two so I left it. When I put the second and third pipes on top of the cracked one I used just a thin patch of mortar and high temp caulk at the top. I fired it up and the top pipes cracked sounding like a firecracker. I don't know what it takes to not crack these things.

    dave

    Leave a comment:


  • WoodchuckDad
    replied
    Re: Oasis Rising

    I got back at it yesterday. I built up the front and made some progress. Then I did something stupid. When I was finishing up I had some mortar left so I packed it in around the bottom the the clay chimney piece so that I would be able to fill the void between the chimney piece and the bricks with vermiculite. a couple hours later I started a fire. I smoked some ribs for about 3 1/2 hours....and in the process I busted the tile. it split and spalled right where I had the mortar packed in, all the way up it's length. So I will be chiseling it out and replacing it. I don't have a picture of the tile yet but here is the brickwork I did.

    Leave a comment:


  • WoodchuckDad
    replied
    Re: Oasis Rising

    I have a ton of stuff weighing down on me the last month. It seems to rain every evening and I had to put some time into final prep for my GSEC test. But I am getting ready to make my final charge on this thing and get the roof on before hunting season begins. As you can see on the left I started building it up to support the chimney. I will try to get the right hand side of it up to match this weekend. Once I do that and tie it in to the front face, I think I will be only a week or two from putting on the roof.

    Leave a comment:


  • countryboy
    replied
    Re: Oasis Rising

    Mmmmm! Nice!

    Leave a comment:


  • WoodchuckDad
    replied
    Re: Oasis Rising

    I just realized that I havn't shown any of the Pizza that I made in this oven yet. So here is a pic of the oven when I knew it was ready to rock.


    My wife wanted to make some Brotchen first so we cooked it up. 2-3 minutes and it was nice and crispy on the outside and chewy on the inside.




    They came out perfect this time. And the crust we let rise then froze and thawed out a few weeks later had a nice sour flavor to it.

    Leave a comment:


  • countryboy
    replied
    Re: Oasis Rising

    WC!

    Nice build! Thoroughly enjoyed reading your build thread. LOVE the brickwork... especially the odd rock thrown in there! Nice front arch, too... we must be drawing inspiration from a couple of the same sources.

    Keep up the posts. Looking forward to seeing you finish it!

    CB

    Leave a comment:


  • leckig
    replied
    Re: Oasis Rising

    4 more feet so the total will be 12 feet I assume?

    Leave a comment:


  • WoodchuckDad
    replied
    Re: Oasis Rising

    It drafts well once it warms up. At first I have gotten some smoke out the front but not much. I try to start the fire under the chimney to warm it up. I will be adding 4 more feet to the chimney so then it will draw like a dragon.

    Leave a comment:


  • leckig
    replied
    Re: Oasis Rising

    how is your vent working out? Good draft? My plan is to pretty much copy your design

    Leave a comment:


  • WoodchuckDad
    replied
    Re: Oasis Rising

    It's 9:25 pm and still 93 degrees outside. Tomorrow's forecast is 106 degrees. I will make pizza tomorrow but not sure I will be laying bricks.

    Leave a comment:

Working...
X