The first day I started I was able to clear away the little amount of top soil I had for my pizza oven location ( 42" Tuscan). Since the bed rock is at the surface I should get no movenment. I had to dig out lots of rock to allow for 3" of gravel. I think I may try to use some of the rocks I dug out for the oven arch or cover the block wall. I had to wait a few days for the weather to clear before I poured the pad. The mixer in the back (home made) didn't work so I had to hand mix 36 bags of ready-mix by hand. The beer sure tasted good while I sat back and watched the pad cure.
The block wall and hearth will be assembled and poured in a couple of weeks during our Canadian Thanksgiving weekend.
Cheers.
The block wall and hearth will be assembled and poured in a couple of weeks during our Canadian Thanksgiving weekend.