I've been working on putting my Casa2G100 in for quite some time now...seems like forever ago when I laid the first CMU! Wanted to put an update out there since we're about 95% of the way done. Here's the details...pics following.
---Engine Casa2G100
---Add-on of 3 additional inches of dome insulation (Ceramic blanket)
---Add-on of 2 additional inches of hearth insulation (Ceramic Fiber board)
---Covered patio - vented through roof with double wall stainless chimney
I did everything except the brick work on the outside...wanted to make it look pretty at least. I'm picking out the granite for the hearth extension and counter / prep area next to it, and will post the final pictures once all the stone and brick are up, and ceiling is stained.
---Engine Casa2G100
---Add-on of 3 additional inches of dome insulation (Ceramic blanket)
---Add-on of 2 additional inches of hearth insulation (Ceramic Fiber board)
---Covered patio - vented through roof with double wall stainless chimney
I did everything except the brick work on the outside...wanted to make it look pretty at least. I'm picking out the granite for the hearth extension and counter / prep area next to it, and will post the final pictures once all the stone and brick are up, and ceiling is stained.