Durham NC Pompeii Build
4. Soldier course set (with cardboard filler between floor and bricks for heat expansion room).
5. Interior arch built.
6. Two courses of bricks cut and mortared into place. I struggled a bit with these courses and a few of my joints line up with the joint below it. The mortar between the bricks is throwing me off and over the space of about 10 bricks, my carefully laid out joints are no longer spaced correctly.
4. Soldier course set (with cardboard filler between floor and bricks for heat expansion room).
5. Interior arch built.
6. Two courses of bricks cut and mortared into place. I struggled a bit with these courses and a few of my joints line up with the joint below it. The mortar between the bricks is throwing me off and over the space of about 10 bricks, my carefully laid out joints are no longer spaced correctly.
Comment