Thank you David
I will leave it for at least a week before laying the bricks. This is very much part time, so no problem
1.2M Oven w/BBQ & Tandoor
Collapse
X
-
Thank you for the tip SS
I have no problem with drying as the temperature is 32 C - 35 C every day. Actually I am more worried about the sun, so I will leave the gazebo over it during drying.
Leave a comment:
-
I underestimated my perlite. Well actually I never even bothered to calculate. My base alone needs 200 litres. I have 100 litres here juswt delivered. My diameter is 1600mm and depth is 100mm. I think that is about 200,000 cc (200 litres). That is excluding the entry arch baseI’m actually just trying to figure this out myself. I’m pouring the first concrete base slab today. 3” concrete. I’m thinking I’ll do another pour over this with a perlite slab(5:1) about 4” thick. Then, I’ll figure out what my firebrick layout will be. Suggestions very much appreciated.Leave a comment:
-
-
Also while the concrete is green (and before you do the perlcrete) drill a few small drain holes through the slab under the oven position. David has been advocating this for a number of years and it helps in the drying process of the perlcrete base insulation pad.Leave a comment:
-
Because there is so much free water left in a vermicrete slab and it is the hardest to eliminate when doing the drying fires, it is a good idea to pause after casting it to allow the sun and wind to dry it as much as possible before proceeding to build over it. More explanation in my attached experiment.I’m actually just trying to figure this out myself. I’m pouring the first concrete base slab today. 3” concrete. I’m thinking I’ll do another pour over this with a perlite slab(5:1) about 4” thick. Then, I’ll figure out what my firebrick layout will be. Suggestions very much appreciated.
Vermicrete insulating slab copy.doc.zip👍 2Leave a comment:
-
Those are the correct ratios, 5-1 for base, 8-10 for insulating the dome.👍 1Leave a comment:
-
I’m actually just trying to figure this out myself. I’m pouring the first concrete base slab today. 3” concrete. I’m thinking I’ll do another pour over this with a perlite slab(5:1) about 4” thick. Then, I’ll figure out what my firebrick layout will be. Suggestions very much appreciated.👍 1Leave a comment:
-
Perlite concrete - Perlite-o-crete - Perlicrete.
I am thinking 5:1 mix for the base and maybe 8:1 or 9:1 for the dome.
What are your opinions on this?Leave a comment:
-
The base is now ready for the 100mm of perlite-a-crete to be poured in the void..
The perlite itself is due to be delivered here this weekend or on Monday.
The white you see in the small right side circle is just formwork. It will be knocked through on Monday. That is where the tandoor vessel will go.
It is very hot again here today @34C.2 PhotosLeave a comment:
-
All the rough work completed now. Will keep the gazebo over it till complete. The sun can be very strong in these months, and besides we may get a few showers of rain.2 Photos👍 1Leave a comment:
-
- Perlite .................... $25.00
- Shipping ................ $21.50
- 60 hollow blocks ... $19.00
- 4 bags Portland .... $18.00
- 300 bricks ............. $60.00
- 10 bags portland ... $45.00
Base is complete ....Leave a comment:
-
Formwork is complete. I have cement mixer and helpers. Will put 100mm under dome first. Then I will insert the frame above for the perlite concrete void
2 PhotosLeave a comment:
-
- Perlite .................... $25.00
- Shipping ................ $21.50
- 60 hollow blocks ... $19.00
- 4 bags Portland .... $18.00
- 300 bricks ............. $60.00
Leave a comment:
-
We will finish the formwork in the morning and pour the concrete soon after
Ciara (pronounced: KEERA) is 3 years old1 PhotoLeave a comment: