    Originally posted by david s

    Because there is so much free water left in a vermicrete slab and it is the hardest to eliminate when doing the drying fires, it is a good idea to pause after casting it to allow the sun and wind to dry it as much as possible before proceeding to build over it. More explanation in my attached experiment.

    [ATTACH]n403610[/ATTACH]
    Thank you David

    I will leave it for at least a week before laying the bricks. This is very much part time, so no problem

    Leave a comment:


  • Irish Chippy
    replied
    Originally posted by SableSprings
    Also while the concrete is green (and before you do the perlcrete) drill a few small drain holes through the slab under the oven position. David has been advocating this for a number of years and it helps in the drying process of the perlcrete base insulation pad.
    Thank you for the tip SS
    I have no problem with drying as the temperature is 32 C - 35 C every day. Actually I am more worried about the sun, so I will leave the gazebo over it during drying.

    Leave a comment:


  • Irish Chippy
    replied
    Originally posted by Monilee
    I’m actually just trying to figure this out myself. I’m pouring the first concrete base slab today. 3” concrete. I’m thinking I’ll do another pour over this with a perlite slab(5:1) about 4” thick. Then, I’ll figure out what my firebrick layout will be. Suggestions very much appreciated.
    I underestimated my perlite. Well actually I never even bothered to calculate. My base alone needs 200 litres. I have 100 litres here juswt delivered. My diameter is 1600mm and depth is 100mm. I think that is about 200,000 cc (200 litres). That is excluding the entry arch base

    Leave a comment:


  • Irish Chippy
    replied
    Originally posted by UtahBeehiver
    Those are the correct ratios, 5-1 for base, 8-10 for insulating the dome.
    Thank you Russell. Maybe I read it from one of your older posts

    Leave a comment:


  • SableSprings
    replied
    Also while the concrete is green (and before you do the perlcrete) drill a few small drain holes through the slab under the oven position. David has been advocating this for a number of years and it helps in the drying process of the perlcrete base insulation pad.

    Leave a comment:


  • david s
    replied
    Originally posted by Monilee
    I’m actually just trying to figure this out myself. I’m pouring the first concrete base slab today. 3” concrete. I’m thinking I’ll do another pour over this with a perlite slab(5:1) about 4” thick. Then, I’ll figure out what my firebrick layout will be. Suggestions very much appreciated.
    Because there is so much free water left in a vermicrete slab and it is the hardest to eliminate when doing the drying fires, it is a good idea to pause after casting it to allow the sun and wind to dry it as much as possible before proceeding to build over it. More explanation in my attached experiment.

    Vermicrete insulating slab copy.doc.zip

    Leave a comment:


  • UtahBeehiver
    replied
    Those are the correct ratios, 5-1 for base, 8-10 for insulating the dome.

    Leave a comment:


  • Monilee
    replied
    I’m actually just trying to figure this out myself. I’m pouring the first concrete base slab today. 3” concrete. I’m thinking I’ll do another pour over this with a perlite slab(5:1) about 4” thick. Then, I’ll figure out what my firebrick layout will be. Suggestions very much appreciated.

    Leave a comment:


  • Irish Chippy
    replied
    Perlite concrete - Perlite-o-crete - Perlicrete.
    I am thinking 5:1 mix for the base and maybe 8:1 or 9:1 for the dome.
    What are your opinions on this?

    Leave a comment:


  • Irish Chippy
    replied
    The base is now ready for the 100mm of perlite-a-crete to be poured in the void..
    The perlite itself is due to be delivered here this weekend or on Monday.
    The white you see in the small right side circle is just formwork. It will be knocked through on Monday. That is where the tandoor vessel will go.
    It is very hot again here today @34C.

    Leave a comment:


  • Irish Chippy
    replied
    All the rough work completed now. Will keep the gazebo over it till complete. The sun can be very strong in these months, and besides we may get a few showers of rain.

    Leave a comment:


  • Irish Chippy
    replied
    • Perlite .................... $25.00
    • Shipping ................ $21.50
    • 60 hollow blocks ... $19.00
    • 4 bags Portland .... $18.00
    • 300 bricks ............. $60.00
    • 10 bags portland ... $45.00
    Running total : ................. $188.50

    Base is complete ....

    Leave a comment:


  • Irish Chippy
    replied
    Formwork is complete. I have cement mixer and helpers. Will put 100mm under dome first. Then I will insert the frame above for the perlite concrete void

    Leave a comment:


  • Irish Chippy
    replied
    • Perlite .................... $25.00
    • Shipping ................ $21.50
    • 60 hollow blocks ... $19.00
    • 4 bags Portland .... $18.00
    • 300 bricks ............. $60.00
    Running Total: ................ $143.50

    Leave a comment:


  • Irish Chippy
    replied
    We will finish the formwork in the morning and pour the concrete soon after