    Almost finished

    I only have the cement roof and the oven is done .l.. although there are plenty of surrounding ground works to be done.
  • david s
    Il Pizzaiolo
    • Mar 2007
    • 9209

    #2
    What a beauty. A very interesting build.
    Thanks for sharing.
    Kindled with zeal and fired with passion.

    Comment

    • fox
      Journeyman
      • Mar 2017
      • 388

      #3
      Thanks Dave, i was lucky to be given a very good budget to build it!
      i should of taken a few more detailed pictures but the mass stops at the inner door and the gallery is made from ceramic board covered in Magply and fiberglassed with a copper finish.
      There is 4’’ of ceramic board under the oven and 900 litres of loose vermiculite surrounding the dome, about 10’’ all around.
      Once the oven is up to temp, the fire is out and the two insulated doors in place it will take four days to fully cool down.

      Comment

      • MarkJerling
        Master Builder
        • Oct 2020
        • 813

        #4
        Originally posted by fox
        I only have the cement roof and the oven is done .l.. although there are plenty of surrounding ground works to be done.
        Wow! Very interesting build. Well done!
        My 42" build: https://community.fornobravo.com/for...ld-new-zealand
        My oven drawings: My oven drawings - Forno Bravo Forum: The Wood-Fired Oven Community

        Comment

        • UtahBeehiver
          Member Moderator
          • May 2012
          • 5260

          #5
          Nice work and super insulated. Should serve you well.
          Russell