We managed to pour the base slab this weekend. It's on undisturbed clay with about 1-1/2" gravel screeded flat. The concrete is heavily reinforced with double rows of rebar around the outer edges, a rebar matrix in the large center region, and a 2x3 mesh about 1" off the bottom throughtout the entire area. The slab is 4" thick, or 35 80# bags. We also inserted vertical rebar after screeding to reinforce the blocks which will be filled with concrete. The odd shape is due to the pedestal doubleling as a retaining wall.
It feels real good to have that done! In the next week while it's curing, we will have time to plot our next moves and get material on-site. We're pumped!
Ken & Dixie Morgan
http://www.fornobravo.com/forum/f3/new-forum-6658.html
We managed to pour the base slab this weekend. It's on undisturbed clay with about 1-1/2" gravel screeded flat. The concrete is heavily reinforced with double rows of rebar around the outer edges, a rebar matrix in the large center region, and a 2x3 mesh about 1" off the bottom throughtout the entire area. The slab is 4" thick, or 35 80# bags. We also inserted vertical rebar after screeding to reinforce the blocks which will be filled with concrete. The odd shape is due to the pedestal doubleling as a retaining wall.
It feels real good to have that done! In the next week while it's curing, we will have time to plot our next moves and get material on-site. We're pumped!
Ken & Dixie Morgan
Comment