My wife and I have been considering a build for a couple of years now. Last summer I built a temporary oven out of old clay bricks. We came across a site online that showed you how to build it. After I got all the materials together it took me a couple of hours to put it together and we were eating pizza that night! We had a lot of fun with that last summer. That confirmed our desire to build a real oven.I'm planning to build a 42" Pompeii oven, corner build with a 6' long countertop for prep work.
I have the footprint for the slab dug out and am considering installing 8" sonotubes in the corners and one at end of the counter at a depth of 42". I'm not sure if I really need them. With 6" of 3/4 crushed stone and then 6" of concrete on top of that the 8" footers may be a little overkill. Any suggestions or opinions?
I have the footprint for the slab dug out and am considering installing 8" sonotubes in the corners and one at end of the counter at a depth of 42". I'm not sure if I really need them. With 6" of 3/4 crushed stone and then 6" of concrete on top of that the 8" footers may be a little overkill. Any suggestions or opinions?
Comment