Re: Medium vs Fine grade Vermiculite?
"Same thing. 2" vermiculite/portland cement and 2" concrete on top?"
No.
The suspended structural slab should be 4 inches of reinforced concrete. Then 4 inches of vermicrete (5:1 mix) on top of that, then the hearth bricks. The insulation layer over the dome should be 4 inches of vermacrete (12:1 mix).
You can start with the vermacrete over the structural slab after one day. Keep the structural slab (and subsequent vermacrete layers) continuously wet for at least seven days - preferably longer.
"Same thing. 2" vermiculite/portland cement and 2" concrete on top?"
No.
The suspended structural slab should be 4 inches of reinforced concrete. Then 4 inches of vermicrete (5:1 mix) on top of that, then the hearth bricks. The insulation layer over the dome should be 4 inches of vermacrete (12:1 mix).
You can start with the vermacrete over the structural slab after one day. Keep the structural slab (and subsequent vermacrete layers) continuously wet for at least seven days - preferably longer.