greetings.
i am putting my build onto my newly poured concrete patio. when i had the patio put in, i had one section made extra thick (~ 8" give or take) with extra rebar.
the problem is, the entire patio has a 1/4" slope to it.. like patios are supposed to.
so, if i put the stand right onto it, it will be sloped.
the question is, where is the best place to level it? do i level the first course of cinderblocks and just have over an inch of mortar on the backside? or do i adjust the concrete 'lid', making it level by attaching the forms for it in such a way that the concrete surface is level.
front to back there is about a 1/2" change in height.
suggestions?
i am putting my build onto my newly poured concrete patio. when i had the patio put in, i had one section made extra thick (~ 8" give or take) with extra rebar.
the problem is, the entire patio has a 1/4" slope to it.. like patios are supposed to.
so, if i put the stand right onto it, it will be sloped.
the question is, where is the best place to level it? do i level the first course of cinderblocks and just have over an inch of mortar on the backside? or do i adjust the concrete 'lid', making it level by attaching the forms for it in such a way that the concrete surface is level.
front to back there is about a 1/2" change in height.
suggestions?