Concrete is poured and the posts are going up
Now that the design is mostly finalized and the digging is done, things are going much faster now. I’ve got 7 out of 10 posts up. The roof structure should be complete within 2 weeks.
<a href="http://n8sbar.servebeer.com/wp-content/uploads/2014/05/WP_20140513_009.jpg">
Now that the design is mostly finalized and the digging is done, things are going much faster now. I’ve got 7 out of 10 posts up. The roof structure should be complete within 2 weeks.