Re: Enclosure update
I finally finished the Hardiboard. Followed up with thin-setting the seams and screw heads. The wiring is roughed in for 2 lights in the front and one on each side. I add 3 more bags (12 cf) of perlite over the dome and pit stack.
The top of the cap is 9 foot off the ground.
Next is stucco. I'll start adding the lathe this weekend and hopefully have the scratch coat done too.
First fire is set for the 13th. 30 days after the keystone brick was laid. Morter should be fully dried.