  • To Footer or Not To Footer - Build begins in DC.

    I can't decide if I should pour footers. I had planned on just doing a 5.5"d reinfoirced slab with 3" of compacted gravel below.

    I live in Wash. DC and we are in a transition zone, winter weather is all over the map. Frost line here is 24".

    Suggestions?
    Last edited by DC8702; 08-23-2010, 08:56 PM.

  • #2
    Re: To Footer or Not To Footer - Build begins in DC.

    The cost difference is really insignificant and the labor is pretty minimal - I would do it.

    Les...
    Check out my pictures here:
    http://www.fornobravo.com/forum/f8/les-build-4207.html

    If at first you don't succeed... Skydiving isn't for you.

    Comment


    • #3
      Re: To Footer or Not To Footer - Build begins in DC.

      I put in a footer, three feet down, one foot thick, extending six inches beyond the footprint of the oven, but I was building a two story chimney. If your oven isn't any taller than you are, I think a reinforced slab on well drained gravel is fine.
      My geodesic oven project: part 1, part 2

      Comment


      • #4
        Re: To Footer or Not To Footer - Build begins in DC.

        I'm in Louisville, KY. Our winters aren't quite as bad as DC, but we get plenty of cold weather. My slab is on a gravel base; so far no problems.
        Ken H. - Kentucky
        42" Pompeii

        Pompeii Oven Construction Video Updated!

        Oven Thread ... Enclosure Thread
        Cost Spreadsheet ... Picasa Web Album

        Comment


        • #5
          Re: To Footer or Not To Footer - Build begins in DC.

          Your reinforced slab is enough. You don't need footings unless you have unusually bad ground conditions. Even if you get movement from frost action, the slab will move as one unit. Unless it tilts enough for the pizzas to slide out on their own this is no problem.
          Last edited by Neil2; 08-24-2010, 06:31 PM.

          Comment


          • #6
            Re: To Footer or Not To Footer - Build begins in DC.

            Originally posted by DC8702 View Post
            I can't decide if I should pour footers. I had planned on just doing a 5.5"d reinfoirced slab with 3" of compacted gravel below.

            I live in Wash. DC and we are in a transition zone, winter weather is all over the map. Frost line here is 24".

            Suggestions?
            I used 4" stone, 5 1/2" concrete with six sono tubes dug down to 42" That is the frost line here in Ct. Lots of rebar and wire mesh for reinforcement.
            Build Thread:http://www.fornobravo.com/forum/f8/i...ome-15521.html
            Photos: http://groups.yahoo.com/group/brick-...67884/pic/list
            Oven Blog: http://johns-brickoven.blogspot.com/...ven-folly.html

            Comment

            Working...
            X