I am pouring the slab on top of my block stand this weekend. I was orignally going to do 3.5" as recommended on the FB install instructions.
A 3" will work exactly with my brick veneer elevations. Does anyone see a problem pouring a 3", reinforced with 1/2" rebar?
I dont have a finishes stand picture to attach, but you can get an idea of shape in the attached. Stand is 4 1/2 courses high.
A 3" will work exactly with my brick veneer elevations. Does anyone see a problem pouring a 3", reinforced with 1/2" rebar?
I dont have a finishes stand picture to attach, but you can get an idea of shape in the attached. Stand is 4 1/2 courses high.
Comment