Hello,
I just poured my hearth slab yesterday. I used a pretty flat surfaced cement board as a bottom base (instead of plywood) for the concrete.
I took an end form off and it looks like the concrete did not adhere to the board. Did I jump the shark in my concrete mix/pour? The day turned into a pretty hot one (after a cold spring, who'd have guessed the temp would soar to near 90?). I did pool water on top of it after it set to keep it cool/moist.
The hearth slab and base are pretty heavily rebarred.
I just poured my hearth slab yesterday. I used a pretty flat surfaced cement board as a bottom base (instead of plywood) for the concrete.
I took an end form off and it looks like the concrete did not adhere to the board. Did I jump the shark in my concrete mix/pour? The day turned into a pretty hot one (after a cold spring, who'd have guessed the temp would soar to near 90?). I did pool water on top of it after it set to keep it cool/moist.
The hearth slab and base are pretty heavily rebarred.