"I am thinking of using steel legs probably 4-5 inch dia. pipe. "
Have you considered concrete piers ? I used 7 1/2 inch sonotube to cast the piers for my oven. Tip: use three piers (not four). You could also extend the piers down into the ground about 4 feet or so and bell out the bottom, this would eliminate the need for a foundation slab.
http://www.fornobravo.com/forum/f21/...ucer-3033.html
http://www.fornobravo.com/forum/f21/...ome-12677.html
"I am thinking of using steel legs probably 4-5 inch dia. pipe. "
Have you considered concrete piers ? I used 7 1/2 inch sonotube to cast the piers for my oven. Tip: use three piers (not four). You could also extend the piers down into the ground about 4 feet or so and bell out the bottom, this would eliminate the need for a foundation slab.
http://www.fornobravo.com/forum/f21/...ucer-3033.html
http://www.fornobravo.com/forum/f21/...ome-12677.html