Hi all!
First off, I'd like to say thank you to FB for this outstanding forum. I'd also like to thank those who have continued to answer questions years after their builds were complete. It is inspiring to see the cumulative effects of the 'minor' innovations. You guys are producing some gorgeous work!
My WBO was designed into the corner of a stone patio project I had going as an afterthought. I didn't give the hearth planning enough thought because there were so many moving parts to this project. I would like to build a 42" oven. The dimensions all worked in my head until I actually drew it out tonight. I didn't add the extra 9" to the outside edge of the dome. All my measurements were taken based on 42" instead of 51". Total rookie mistake!
So, my question is what would you all do in my situation? The slab isn't poured yet. I can extend the slab over the back side of the patio frame, but I don't know yet what I would do to veneer the concrete. I could also build a really short oven landing but I think I would regret that.
Not sure what to do here. I am trying to follow the guidelines as posted at http://www.fornobravo.com/forum/f6/m...earth-657.html. Which means 42" floor + 9" walls + 6" vent floor + 5" rear insulation + 5" 1wall + 12" landing.
Sorry for the quick hand drawings. I'm having someone pour the slab on Thursday and need to know what to tell him. I'd pour it myself, but I'm running out of Fall days to work.
In case it isn't obvious, the drawing shows the top down view. The pictures show the corner where the oven will be built.
Casey
First off, I'd like to say thank you to FB for this outstanding forum. I'd also like to thank those who have continued to answer questions years after their builds were complete. It is inspiring to see the cumulative effects of the 'minor' innovations. You guys are producing some gorgeous work!
My WBO was designed into the corner of a stone patio project I had going as an afterthought. I didn't give the hearth planning enough thought because there were so many moving parts to this project. I would like to build a 42" oven. The dimensions all worked in my head until I actually drew it out tonight. I didn't add the extra 9" to the outside edge of the dome. All my measurements were taken based on 42" instead of 51". Total rookie mistake!
So, my question is what would you all do in my situation? The slab isn't poured yet. I can extend the slab over the back side of the patio frame, but I don't know yet what I would do to veneer the concrete. I could also build a really short oven landing but I think I would regret that.
Not sure what to do here. I am trying to follow the guidelines as posted at http://www.fornobravo.com/forum/f6/m...earth-657.html. Which means 42" floor + 9" walls + 6" vent floor + 5" rear insulation + 5" 1wall + 12" landing.
Sorry for the quick hand drawings. I'm having someone pour the slab on Thursday and need to know what to tell him. I'd pour it myself, but I'm running out of Fall days to work.
In case it isn't obvious, the drawing shows the top down view. The pictures show the corner where the oven will be built.
Casey