Hi I have seen the spreadsheet of Deejayoh. It's a very impressive spreadsheet.
I'm going to build a pizzaoven with a low dome, and my mathematic or geometry skills (i donīt know if you can say that in english) are not as good as they have been.
When I use the spreadsheet for my low dome project 38,5" and with a dome hight of 15.6" i can calculate a more flat curve if I put the value for the IT Tool at aprox minus 14". But - I would like to start with a brick on top of the soldiers with an angel of 45 degrees as shown on the above picture. Anyone knows how to put that into the spreadsheet?
Jesper
I'm going to build a pizzaoven with a low dome, and my mathematic or geometry skills (i donīt know if you can say that in english) are not as good as they have been.
When I use the spreadsheet for my low dome project 38,5" and with a dome hight of 15.6" i can calculate a more flat curve if I put the value for the IT Tool at aprox minus 14". But - I would like to start with a brick on top of the soldiers with an angel of 45 degrees as shown on the above picture. Anyone knows how to put that into the spreadsheet?
Jesper