So after fiddling with the arrangment of the pieces i was able to get my gaps in the dome even, in the end there was around a 1/4 inch between each. And again i had to take a photo of my assistants. Then on to insulating. I managed to get 3 layers of the insulating blankets over the oven. Originally I was planning to do a full 2 inches of perlcrete over the dome, after managing to get 3 inches of the blanket on i changed direction and thought i would nix it, then i continued thinking and reading and came to the conclusion i should do a minimal layer, to have something for the next stucco layer to bond to, and even out the shape. Ive started with the curing fires and on day 3 i found a hot spot on top of the dome.
So i suppose by question is, would i be better to throw an extra layer of blanket over the top that i saved, then stucco over, or just add more perlcrete, or both?
Im tempted to just rush the process because i can already taste that pizza but i dont know if a little more caution may be appropriate.
Announcement
Collapse
No announcement yet.
About to start a corner build
Collapse
X
-
So i got the dome assembled, I put the wife to work and made her support everything while assembling it. But with a piece or two of wood cut to size it could have been a one man job. My girls were getting excited and had to be part of the process.5 Photos
Leave a comment:
-
Mixing and putting down a 2 inch layer of perlite insulation. I dont think i really needed it for insulation value as im using 2 inch casi board under the oven but it also helped smooth out a little bit on undulation in the suspended slab. My first experience working with perlcrete, its pretty cool stuff to work with. And i picked up the oven kit yesterday.4 Photos
Leave a comment:
-
just make sure you don't get mortar and concrete from the build on it or in it...that's why I did mine last. I used a micro channel drain only like 1" wide
Leave a comment:
-
That's a good idea, maybe after I have the first course of block mortared down I'll do that as well before I pour the hearthOriginally posted by Chach View PostI ended up pouring 2 1/2" on top of the wood storage floor after I built the stand and i pitched it out. I was worried of water getting in as well.
Ricky
Leave a comment:
-
I installed a channel drain in the front of my entire structure to re direct the rain water because I was getting pooling in front of the fireplace on my pavers so for some good measure I installed it in front of the entire structure and ran a pipe from that to the back of the yard and now no more pooling.Originally posted by JRPizza View PostIf water can drain down through your pavers drain you shouldn't have any problems. I don't get a ton of water but if it is raining hard I can't cook in my socks
Ricky
Leave a comment:
-
If water can drain down through your pavers drain you shouldn't have any problems. I don't get a ton of water but if it is raining hard I can't cook in my socks
Leave a comment:
-
I ended up pouring 2 1/2" on top of the wood storage floor after I built the stand and i pitched it out. I was worried of water getting in as well.
Ricky
Leave a comment:
-
Yeah I thought about that to, but didn't want to go to crazy with the slab. I put a groove in between the slab and pavers, I was thinking of also putting stone veneer on the floor and drilling a few drain holes through the base of the stand
Leave a comment:
-
Your oven is placed similarly to mine and it looks like it might be at the low end of your patio slope, I get water running downslope and kind of wish I had raised my slab an inch or so to keep the water out of the wood storage area.
Leave a comment:





Leave a comment: