I'm using a 100 mm thick Vermiculite Cement mix on my concrete base for insulation. How long should it be left before I can build the cooking floor/dome?
If my Vermiculite cement isn't perfectly flat (I'll do my best!), is there anything more that I could do before laying the cooking floor?
Any experience, ideas, etc would be gratefully received.