So I have just been given 2 concrete slabs in excellent condition. One is 6'x5'x4" & the other is 6'x2'x10".
Looking at the plans, if I put the 2 together it will be just a few inches smaller than what the plan calls for, but large enough to build the 42" oven on top of.
My plan is to dig out the hole & pack sand into it until the slabs are both level & even with the ground. I realize there is a difference in width between the 2, but it shouldnt be too hard to match them.
Any major problems with doing it this way as opposed to pouring a foundation?
S.
Looking at the plans, if I put the 2 together it will be just a few inches smaller than what the plan calls for, but large enough to build the 42" oven on top of.
My plan is to dig out the hole & pack sand into it until the slabs are both level & even with the ground. I realize there is a difference in width between the 2, but it shouldnt be too hard to match them.
Any major problems with doing it this way as opposed to pouring a foundation?
S.