Originally posted by franciscocb
View Post
) You are correct, the picture of the vcrete doesn't look right. there should have been some "sticking" between vermiculite pieces with the Portland Cement component. The good news is that the 2" of CaSil insulation board is adequate for the base of the oven. Vcrete does take much longer to cure than mortar or concrete and is crumbly even when done correctly. It's the compression strength that's important and 5:1 will support the footprint of a WFO. After a week, dig into a corner a little and see if you start seeing a matrix that holds together. If that is the case then I'd mix a little mortar up and put in a perimeter band about 2-3" wide to contain the loose vermiculite. When you set your 2" FB on top, you'll be ready to start planning the dome & cooking floor build steps. Because the vcrete is crumbly, you should be planning on leaving your forms in place until ready to enclose the base layer(s) with your perimeter & cover materials...you don't need to be knocking off corners and edges of the vcrete while you're working on the rest of the oven.Don't add more water to the existing vcrete, it's tough enough to remove at the recommended hydration level. Also, did you drill any weep holes in your top slab? This would be your last chance to do so if you haven't.
Hope that answers your question(s).





Leave a comment: