Originally posted by Engine357
View Post
I would reccomend that you dig a small (1ftx1ft) test hole about 2-3ft deep on one side of the slab so you can see (a) how deep it goes and (b) what's under it. If it's on loose soil, then rather break it up and start over but if it's on good basecourse then it's usable.
Leave a comment: