Hello Everyone, I was wondering if someone could help me out with a couple problems that have set me back a bit. First of all, the Hearth that I poured for my oven did not dry properly. It did in a few places but for the most part the vermiculite and concrete remain wet or at least dry and squishy. Then, I made the oven floor out of fireclay and sand all just like it said in the plans I downloaded and that mixture did not harden either. I waited about 2-3 weeks hoping that maybe my mixture was just a little slow or something but its been 4 months now and im preparing to start up construction. Before I start though, I want to make sure I know what went wrong and also if someone could explain very simply how the heart and cooking floor mixtures should be constructed. Thank You.