Thanks - I think it would work - open span for my base is 1.1 metres so I reckon 4 lintels would only leave spans of 5-6" of Hardibacker (sorry to mix metric & imperial!). If it doesn't look to be enough I could always double up the Hardibacker and epoxy the boards together to make a constrained layer for strength. Planning to use a modular oven so probably less weight than a brick Pompeii.

Leave a comment: