Ok, I was following Alan Scott and put a 2" layer of vermiculite / portland on the bottom of the hearth, then I ended up with a 5 1/2 layer of structural concrete. No I am thinking I should lay in an additional layer of vermiculite on top of the concrete? Any Thoughts?
36" Pompeii
Oh, I wanted a 42" oven and screwed up the hearth pour. Looking at the attached photos, can I get away with pouring vermiculite / concrete extending the hearth all the way down to the block?
Thanks,
Rick
36" Pompeii
Oh, I wanted a 42" oven and screwed up the hearth pour. Looking at the attached photos, can I get away with pouring vermiculite / concrete extending the hearth all the way down to the block?
Thanks,
Rick