If I understand the instructions for installation, we:
1. grout the joints in the dome;
2. put a 1" thick layer of mortar all over the dome;
3. lay the insulation blanket over the mortar;
4. finally, either layer more mortar over the blanket, or fill the space with perlite or vermiculite.
Assuming that all this is correct, at what point does the curing take place? Can I just grout the joints, wait till the grout dries, then cure the oven (before adding the layer of mortar for insulation? Or, do I have to apply the mortar, wait a week, then start the curing process?
1. grout the joints in the dome;
2. put a 1" thick layer of mortar all over the dome;
3. lay the insulation blanket over the mortar;
4. finally, either layer more mortar over the blanket, or fill the space with perlite or vermiculite.
Assuming that all this is correct, at what point does the curing take place? Can I just grout the joints, wait till the grout dries, then cure the oven (before adding the layer of mortar for insulation? Or, do I have to apply the mortar, wait a week, then start the curing process?
Comment