Hello, my wife purchased a modular brick oven last year (unfortunately not from this site). I am ready to assemble it, but I am not sure of the process. I poured a 4 inch concrete slab for as a counter for it. My questions start with do I pour a vermiculite base now for the whole oven, if so how thick and ratio of vermiculite and cement ? Or do I just pour some vermiculite under the oven only ? Second, do I just assemble the oven then, coat with vermiculite and cemnt mix (thickness & ratio ? ), wrap with insulation blanket, chicken wire, coat agai with vermiculite and cement ?
I am looking for kind of an idea of the process. I think I know, or atleast I think I know what most of the process will be.
I also want to note I live in lower NY state ( 60 miles North West of NYC ) it can get a little cold in winter. I already planned on putting a roof over it, is their anything else I should consider.
Thank You All.
Anthony
I am looking for kind of an idea of the process. I think I know, or atleast I think I know what most of the process will be.
I also want to note I live in lower NY state ( 60 miles North West of NYC ) it can get a little cold in winter. I already planned on putting a roof over it, is their anything else I should consider.
Thank You All.
Anthony
Comment